Warwickslade Cutting: the new stream flows
Taken slightly further to the left than the earlier photo because I didn't want to get my feet wet. The Cutting has not yet been filled in here but its flow has been diverted into the newly reconstructed stream. A clay aqueduct has been built here to enable the new stream to flow across the line of the Cutting. The pump is doing its best to empty the Cutting on the lefthand (upstream) side, so that it can be filled in. See also Link
.
Earlier Link
Later Link
Earlier Link
Warwickslade Cutting
Warwickslade Cutting was a long, straight drainage ditch dug around 1850. In 2009, The Forestry Commission decided to fill it in and replace it by a more natural, meandering stream. The Forestry Commission was carrying out the works as part of its "Final 4000" programme - a joint effort with Natural England, The Environment Agency and the National Park Authority - which aims to restore the last 4,000 hectares of SSSI in the New Forest that are deemed to be in an unfavourable condition.
The reason for the works was that Warwickslade Lawn SSSI was "in an unfavourable declining condition because the artificially deepened cutting meant that there was no seasonal inundation of the grassland and woodland habitats" (FC restoration plan).
Surprisingly, much of the course of the original, pre-1850s, stream could still be seen on the ground. The aim of the works was to reinstate the original stream as closely as possible, whilst filling in the Cutting. It was necessary to bring in 10,000 tonnes of hoggin to fill in the cutting, plus some clay to make plugs to ensure that water followed the desired course.
The contractors were Alaska Environmental Contracting ( Link). They used 8, 13 and 18 tonne hydraulic excavators, 10 tonne rubber tracked dumper trucks and an innovative light railway.
Other related sequences of pictures:-
SU2705 : Warwickslade Cutting: a planned meander (start of sequence)
SU2606 : Warwickslade Cutting: original stream bed, Knightwood end (start of sequence)
SU2606 : Warwickslade Cutting: the new stream takes shape (start of dequence)
SU2705 : Warwickslade Cutting: original stream bed, Vinney Ridge part (start of sequence)
SU2606 : Warwickslade Cutting: filling it in, Knightwood end (start of sequence)
SU2705 : Warwickslade Cutting: filling it in, Vinney Ridge part (start of sequence)
SU2705 : Warwickslade Cutting: infilling of minor drain (start of sequence)
SU2705 : Warwickslade Cutting: laying the railway (start of sequence)
SU2705 : Warwickslade Cutting: running the railway (start of sequence)
SU2704 : Warwickslade Cutting: repositioned railway (start of sequence)
SU2705 : Warwickslade Cutting: refencing Poundhill Inclosure (start of sequence)
SU2705 : Warwickslade Cutting: flood plain (start of sequence)
SU2705 : Warwickslade Cutting: the end of the project
The above sequences have Previous/Next or Upstream/Downstream links that take you to a different place. They also have Earlier/Later links that take you to the same place at a different time.
TIP: Click the map to open OS Get-a-Map
Change to interactive Map >
Change to interactive Map >
- Grid Square
- SU2705, 173 images (more nearby)
- Photographer
- Peter Facey (find more nearby)
- Image classification
- Geograph
- Date Taken
- Wednesday, 21 October, 2009 (more nearby)
- Submitted
- Wednesday, 21 October, 2009
- Category
- Restoration work (more nearby)
- Subject Location
-
OSGB36:
SU 2773 0514 [10m precision]
WGS84: 50:50.7074N 1:36.4502W - Photographer Location
-
OSGB36:
SU 2773 0514 - View Direction
- Northeast (about 45 degrees)
Looking for a postcode? Try this page
This page has been viewed about 21 times.
View this location:
KML (Google Earth),
Google Maps
,
OS Get-a-map™
,
OS Map Checksheet,
Geograph Map,
More Links for this image
![Creative Commons Licence [Some Rights Reserved]](http://creativecommons.org/images/public/somerights20.gif)