'Night shift'
'Night shift'
A heavy crane on a floating barge, 'Forth Atlas', with the 'Forth Sentinel' moored on its left, carry on in the dark with removal of the guiding booms and bollards NZ2563 : Bollards west of the Gateshead Millennium Bridge below the Gateshead Millennium Bridge NZ2563 : Gateshead Millennium Bridge, opposite the Baltic Art Gallery NZ2563 : Baltic Flour Mills (detail). The work to remove what was dubbed 'the Harbourmaster's Piles' LinkExternal link is expected to take six weeks.
Gateshead Millennium Bridge VCPS
The Gateshead Millennium Bridge Vessel Collision Protection System (VCPS) was designed to protect the bridge from ship collision.

The bollards in the river bed and their attached booms NZ2563 : Millennium Bridge View - Halfway across were never part of the original plan for the Gateshead Millennium Bridge NZ2563 : Gateshead Millennium Bridge which was designed to float above the surface of an uninterrupted river. They were insisted upon by the Port of Tyne Authority on safety grounds to prevent a ship colliding with the bridge and confining them to the deepest part of the river. As an eye-sore they were referred to locally as 'the Harbourmaster's Piles' LinkExternal link

A review of the Vessel Collision Protection System (VCPS) and predicted movements of shipping was carried out in 2009. The cost of removal was estimated at £650,000, little more than the expected cost of their continued maintenance LinkExternal link

There was no great rush to remove them, although a contract specification for tenders was released by Gateshead Council in Autumn 2010.

In February 2012, civil engineers, BAM Nuttall, started the six-week process of extracting the bridge’s vessel collision protection system. The work is expected to be finished by the end of March. The floating crane which the contractors needed to do the job was delayed on another contact in Sierra Leone. A replacement, 'Forth Atlas', arrived at the bridge on 14 February 2012, allowing work to start.

Removing the VCPS involves dismantling its 14 horizontal fenders together with their flotation units, and then extracting 16 piles from their positions deep within the river bed. This will be done using a vibration unit operated from Atlas floating crane. The remaining holes will then be filled with sand LinkExternal link
Creative Commons Licence [Some Rights Reserved]   © Copyright Andrew Curtis and licensed for reuse under this Creative Commons Licence.
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for Large scale mapping
Change to interactive Map >
Grid Square
NZ2563, 1549 images   (more nearby )
Photographer
  (find more nearby)
Date Taken
Wednesday, 15 February, 2012   (more nearby)
Submitted
Wednesday, 15 February, 2012
Geographical Context
Lowlands  Paths  Rivers, Streams, Drainage  City, Town centre  Construction, Development 
Subject Location
OSGB36: geotagged! NZ 2580 6397 [10m precision]
WGS84: 54:58.1813N 1:35.9114W
Camera Location
OSGB36: geotagged! NZ 2575 6399
View Direction
East-southeast (about 112 degrees)
Looking for a postcode? Try this pageExternal link
Clickable map
+


Image classification(about): Geograph
This page has been viewed about 79 times.
View this location: KML (Google Earth) · Google MapsExternal link · Bing MapsExternal link · OS Map Checksheet · Geograph Map · geotagged! More Links for this image
NW N NE
W Go E
SW S SE
[Mark
You are not logged in login | register