Pipe sections made from glass reinforced plastic on the line of the pipe to carry water to the power house on the shore of Loch Laggan. The hill in the background is Meall a Chrotha.
Pattack Hydro scheme :: NN5486

In 2016 construction began on a 9MW hydroelectric scheme on the River Pattack in the Ardverikie Estate, Laggan. A dam will create a reservoir from which a buried pipeline will take water down to a powerhouse on the shore of Loch Laggan. The dam top is at 406m above Ordnance datum, limiting the reservoir extent to about 500m upstream.


Creative Commons Licence [Some Rights Reserved]   © Copyright Jim Barton and licensed for reuse under this Creative Commons Licence.
Geographical Context: Uplands Construction, Development Moorland other tags: Grassy Moorland Hydro-Electric Scheme Pipeline Construction Click a tag, to view other nearby images.
This photo is linked from: Articles: · Images shortlisted for POTY, 2016 Automatic Clusters: · Hydro Pipeline [4] · Hill in the Background [2] · Pipe [2] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
NN5485, 14 images   (more nearby 🔍)
Photographer
Jim Barton   (more nearby)
Date Taken
Saturday, 3 December, 2016   (more nearby)
Submitted
Tuesday, 6 December, 2016
Subject Location
OSGB36: geotagged! NN 5449 8588 [10m precision]
WGS84: 56:56.4746N 4:23.6027W
Camera Location
OSGB36: geotagged! NN 5449 8588
View Direction
South-southwest (about 202 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image Type (about): geograph 
This page has been viewed about 121 times
You are not logged in login | register