SD8417 : Working on the hub 60 metres up
near to Cheesden, Rochdale, Great Britain

Working on the hub 60 metres up.
The engineer works on the hub of tower No 10 after the blades were fitted earlier in the day.
The only way to access the interior workings of the hub is by opening the roof of the nacelle and crawling along one of the set of fixed ladders attached to the side of the hub.
Quite an experience I would think and not one for the faint hearted especially being 60 metres up from the ground.
Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm.
Construction of the wind turbines began back in November 2007 at Turbine No 16.
By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog, gale force winds, torrential rain, snow and ice during the winter months of 2008.
On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm.
Children from Edenfield Primary School, who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.Link
Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons.
I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!"
Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out."
SD8417 : Turbine Tower No 10 under construction
SD8418 : Turbine Tower No 18 under construction
SD8318 : Scout Moor Turbine Tower No 16 under construction
SD8418 : Top section of turbine tower 21 being lifted into position
SD8418 : The very first completed wind turbine on Scout Moor
Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80 Link
Key Facts Link
Scout Moor Wind Farm Picture Gallery Link
The only way to access the interior workings of the hub is by opening the roof of the nacelle and crawling along one of the set of fixed ladders attached to the side of the hub.
Quite an experience I would think and not one for the faint hearted especially being 60 metres up from the ground.
Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm.
Construction of the wind turbines began back in November 2007 at Turbine No 16.
By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog, gale force winds, torrential rain, snow and ice during the winter months of 2008.
On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm.
Children from Edenfield Primary School, who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.Link
Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons.
I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!"
Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out."
SD8417 : Turbine Tower No 10 under construction
SD8418 : Turbine Tower No 18 under construction
SD8318 : Scout Moor Turbine Tower No 16 under construction
SD8418 : Top section of turbine tower 21 being lifted into position
SD8418 : The very first completed wind turbine on Scout Moor
Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80 Link
Key Facts Link
Scout Moor Wind Farm Picture Gallery Link
year taken
2008
TIP: Click the map for Large scale mapping
Change to interactive Map >
Change to interactive Map >
- Grid Square
- SD8417, 28 images (more nearby)
- Photographer
- Paul Anderson (find more nearby)
- Image classification?
- Supplemental image
- Date Taken
- Monday, 18 February, 2008 (more nearby)
- Submitted
- Tuesday, 19 February, 2008
- Category
- Wind turbines (more nearby)
- Subject Location
-
OSGB36:
SD 841 178 [100m precision]
WGS84: 53:39.4032N 2:14.4509W - Photographer Location
-
OSGB36:
SD 841 178 - View Direction
- EAST (about 90 degrees)
Looking for a postcode? Try this page
This page has been viewed about 4108 times.
View this location:
KML (Google Earth) ·
Google Maps
·
OS Map Checksheet ·
Geograph Map ·
More Links for this image
![Creative Commons Licence [Some Rights Reserved]](http://creativecommons.org/images/public/somerights20.gif)