SD8218 : Turbine Tower No 22 under construction

3 km from Edenfield, Lancashire, Great Britain

Turbine Tower No 22 under construction
Turbine Tower No 22 under construction
At 450 metres above sea level these two turbines are at the highest point on Scout Moor.
The first of three blades is seen here being attached to Turbine No 22 which was completed on Monday the 19th of May 2008.
Turbine No 24 on the right was completed on Friday the 16th of May 2008.
SD8218 : Tightening the bolts at Turbine No 24
SD8417 : View from the top of Turbine Tower No 10 looking North West
SD7919 : Turbine tower section passing Edenfield Primary School
SD8418 : The very first completed wind turbine on Scout Moor
SD8417 : Turbine Tower No 10 under construction
SD8417 : Working on the hub 60 metres up.

Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80 LinkExternal link

Key Facts LinkExternal link

Scout Moor Wind Farm Construction Picture Gallery
LinkExternal link
Creative Commons Licence [Some Rights Reserved]   © Copyright Paul Anderson and licensed for reuse under this Creative Commons Licence.
year taken
2008
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map to open OS Get-a-Map
Change to interactive Map >
Grid Square
SD8218, 139 images   (more nearby)
Photographer
Paul Anderson   (find more nearby)
Image classification
Geograph
Date Taken
Monday, 19 May, 2008   (more nearby)
Submitted
Tuesday, 20 May, 2008
Category
Wind turbine   (more nearby)
Subject Location
OSGB36: geotagged! SD 825 188 [100m precision]
WGS84: 53:39.9339N 2:15.9612W
Photographer Location
OSGB36: geotagged! SD 827 187
View Direction
West-northwest (about 292 degrees)
Looking for a postcode? Try this pageExternal link
Clickable map
+

Forward to a
Friend > >


Text listing of Images in SD8218

This page has been viewed about 97 times.
NW N NE
W Go E
SW S SE
[Mark
You are not logged in login | register