2008

SD8218 : Scout Moor Wind Farm Official Opening (1)

taken 15 years ago, 3 km from Edenfield, Lancashire, England

Scout Moor Wind Farm Official Opening (1)
Scout Moor Wind Farm Official Opening (1)
Dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm on the 25th of September 2008.
Children above from Edenfield Primary School, who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.
Head Teacher at Edenfield Primary School, Janet Reidy, said: "It is superb for the children to be involved today after all the work they have done about the wind farm in their lessons. I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews here!"

SD8218 : Scout Moor Wind Farm Official Opening (2)
SD8218 : Scout Moor Wind Farm Official Opening (3)
SD8218 : Scout Moor Wind Farm Official Opening (4)
SD8417 : Working on the hub 60 metres up.
SD7919 : Last Turbine Tower Delivery to Scout Moor


Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80 LinkExternal link (Archive LinkExternal link )

Key Facts LinkExternal link (Archive LinkExternal link )

Scout Moor Wind Farm Construction Picture Gallery
Link

Creative Commons Licence [Some Rights Reserved]   © Copyright Paul Anderson and licensed for reuse under this Creative Commons Licence.
Category: Wind farm
This photo is linked from: Galleries: · Scout Moor Wind Farm Under Construction · Scout Moor Wind Farm Under Construction Automatic Clusters: · Scout Moor Wind Farm Official Opening [45] Other Photos: · Wind Turbine Base No 5 on Scout Moor · Turbine Base No 6 · Scout Moor Wind Farm Delivery Market Street Edenfield · Turbine No 16 under construction on Scout Moor · Scout Moor Turbine Tower No 16 under construction · Scout Moor Wind Turbine Construction · Top section of turbine tower 21 being lifted into position · First blade is attached to Turbine No 21 · Scout Moor Wind Farm under construction · Scout Moor Wind Farm from M62 · Scout Moor Wind Farm under construction · Turbine tower sections heading for Scout Moor · Two turbine tower sections heading for Scout Moor · Turbine tower section passing Edenfield Primary School · Working on the hub 60 metres up. · Scout Moor Turbine Towers 15 and 21 · Scout Moor Wind Turbines and Knowl Hill · Working 60 metres up on Turbine Tower No 10 · Installing the base section of Tower No 7 · Scout Moor access road · Scout Moor Turbine Base No 13 · Completed Turbine Towers 8 and 12 on Scout Moor · Construction begins on Turbine Tower No 8 · Scout Moor Wind Turbine No 25 goes live · Turbine Tower No 25 · Turbine Convoy passing through Bridge Mills · Turbine Tower No 3 under construction on Scout Moor · Turbine Tower No 15 during testing · Scout Moor Wind Farm · Turbine Base No 17 and Ashworth Moor Reservoir · Aerial View of Scout Moor Wind Farm Turbine No 2 · Scout Moor Turbine Towers 7, 1 and 3 · First Blade for Turbine Tower No 11 · Turbine Delivery Passing Through Ewood Bridge · Completed Turbine Tower No 11 on Scout Moor · Edenfield Road Norden · Preparing Gearbox, Rotor Shaft and Disk Brake for Lifting · Attaching First Blade to Turbine No 22 · Turbine Convoy enroute to Scout Moor · Turbine Convoy passing Ramsbottom on the M66 · Turbine Tower section delivery · Turbine Towers 22 and 24 at Scout Moor · Turbine Blade Delivery Passing through Edenfield · Turbine Blade Convoy Passing through Edenfield · Last Turbine Tower Delivery to Scout Moor · Nacelle of Turbine Tower No 26 · Attaching the top section of Turbine No 17 · Turbine No 26 from Whittle Pike · Construction Crew of Turbine No 23 on Scout Moor · Turbine Tower No 26 on Scout Moor · Ground crew at Turbine No 23 on Scout Moor · Engineer working on the hub of Turbine No 2 · Turbine No 16 in Full Flight · Ramsbottom and Scout Moor Wind Farm · Wind Farm Electricity Sub Station · Turbine No 16 under construction on Scout Moor · Gearbox , Rotor Shaft and Disk Brake Assembly · Turbine Convoy enroute to Scout Moor · Scout Moor Wind Farm Official Opening (2) · Scout Moor Wind Farm Official Opening (3) · Scout Moor Wind Farm Official Opening (4) · Scout Moor Wind Farm Official Opening · Live BBC Broadcast from Scout Moor · Granada Reports from Scout Moor · Scout Moor Wind Farm · Turbine Towers 19 and 18 on Scout Moor · Installing Gearbox Assembly at Turbine No 11 · Working on the Hub of Turbine No 2 at Scout Moor · Turbine Towers 2 and 4 on Scout Moor · Scout Moor Wind Farm Turbine Tower No's 1 and 7 · Turbine Convoy passing Edenfield Methodist Church · Installing Gearbox , Rotor Shaft and Disk Brake Assembly · Installing Gearbox , Rotor Shaft and Disk Brake Assembly · Scout Moor Wind Farm Turbine Towers 12 and 16 · Turbine Tower No 20 during construction · Turbine Tower No 23 construction site in May 2008 · Turbine Tower No 26 at Scout Moor · Turbine Tower No 17 during construction in June 2008 · Scout Moor Wind Farm Turbine Towers · Turbine Tower No 23 under construction at Scout Moor · The Final Turbine Blade for Tower No 23 · Turbine Tower Base · Turbine Tower No 11 under construction · Scout Moor Wind Turbine No 25 goes live · Turbine No 21 at Sunset · Turbine No 21 under construction · Working on the Hub of Turbine No 10 at Scout Moor · Sunset on Scout Moor · Turbine No 26 on Scout Moor · Turbine No 4 on Scout Moor · Turbine Tower No 2 on Scout Moor · Turbine No 2 on Scout Moor · Scout Moor Wind Farm · Turbine No 5 on Scout Moor · Scout Moor Wind Farm in Winter · Turbine No 23 and Access Road · Wind Turbines on Scout Moor · Scout Moor Turbine No 2 · Turbines at Sunset · Turbine No 21 on Scout Moor · Winter Sun on Scout Moor · Scout Moor in Winter · Turbine No 16 and Met Mast · Scout Moor Wind Farm in Winter · Scout Moor Wind Farm Turbine Tower No 12 · Scout Moor Wind Farm · Turbine Tower section delivery to Scout Moor · Wide Load on the A680 · The Second Blade for Turbine No 11 Arrives on Site · Engineers prepare tower section for lifting · Attaching the top section of Turbine No 17 · Turbine Towers 13 and 11 · Turbine Tower No 20 under construction · Scout Moor Wind Farm Turbine Tower No 14 · The Final Turbine Tower Delivery to Scout Moor · Scout Moor Wind Farm in Winter · Turbine Tower No 8 Under Construction · Turbine Tower No 8 Under Construction ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SD8218, 153 images   (more nearby 🔍)
Photographer
Paul Anderson   (more nearby)
Date Taken
Thursday, 25 September, 2008   (more nearby)
Submitted
Friday, 26 September, 2008
Subject Location
OSGB36: geotagged! SD 825 187 [100m precision]
WGS84: 53:39.9016N 2:15.9520W
Camera Location
OSGB36: geotagged! SD 825 187
View Direction
SOUTH (about 180 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Supplemental image
This page has been viewed about 879 times
You are not logged in login | register