NZ2463 : Cross Country train approaches Newcastle Central
taken 13 years ago, near to Gateshead, England
The bridge was designed and engineered by Charles A. Harrison, the Chief Civil Engineer of the North Eastern Railway, and built by the Cleveland Bridge & Engineering Company in Darlington between 1902 and 1906 Link Link
The bridge is not particularly elegant but functional, consisting of four lattice steel spans NZ2463 : Cross Country train crossing King Edward VII Bridge resting on concrete-filled caissons, used in the construction Link Link
The total length of the bridge is 1,150 feet (350 m) and 112 ft (34 m) above high water mark. It was built with the aid of the largest cableway in the world, 463.5m long, suspended 61m above high water made of 7.6cm diameter steel Link It carried over 23,000 tons of material. After the bridge was finished, the cable was sent to the Swan Hunter and Wigham Richardson shipyard, where it was used to launch the Mauritania.
Originally trains used the High Level Bridge to reach Newcastle Central Station and had to leave the station in the same direction they had entered from, which involved the tedious task of reversing.
The construction of the King Edward VII Bridge provided four more rail tracks NZ2463 : King Edward VII Bridge, and a direct line through the station enabling trains to enter or leave from either side and thus eased rail congestion NZ2463 : Cross Country train approaches Newcastle Central
Link
The bridge was opened by King Edward VII and Queen Alexandra on 10 July 1906. The total cost amounted to £500,000.
Wikipedia: Link
Tyne & Wear Museums: Archive Link
Bridges on the Tyne: Link Archive Link
SINE: Archive Link
Construction started on Forth Banks Goods Station in 1866. It was designed by architect, Thomas Prosser, and was commissioned by the North Eastern Railway (NER). The Goods Station opened on the 3rd March 1871. There are photos of the interior here Link Link
In 1904, a new goods station was built for the NER, facing on to Forth Banks, on the end of Prosser's existing station. The probable architect was William Bell. It was extended eastwards by the building of a small, three storey, ferro-concrete shed in 1905. It was designed by William Bell and built by L G Mouchel's Hennebique Company. There is a 1989 photo here: Link
It is a Grade II Listed Building Link
Prosser's goods shed was cut in two by the building of the approach viaduct to the King Edward Bridge in 1904 but was one of the largest goods stations in the world. There is an aerial photo of the location from 1929 here Link
All that now survives of Prosser's goods shed is the undercroft, the south face of which is a sandstone wall pierced by arch headed openings which runs alongside Pottery Lane. The rest was demolished in 1972.
Some literature maintains that the Newcastle-Carlisle Railway once had a passenger station on this site, or even that the Forth Banks Goods Warehouse itself was once a railway station. There appears to be little evidence for this, and the confusion may have arisen from its (second) temporary terminus (1847-1851) just west of Central Station being called Forth NZ2463 : Former site of Newcastle Forth Railway Station
Alan Young provides a plausible and likely scenario here Link
The first terminus of the railway after the first Scotswood Railway Bridge was built (1839), taking it from Blaydon to the north of the Tyne, is usually referred to as 'Shot Tower’ or ‘Railway Street’, located just north of the current Arena car park. It was used from 1839 to 1847 Link
The railway eventually terminated at Central Station shortly after it was completed in 1851.
SINE: Archive Link
English Heritage Pastscape: Link Archive Link
English Heritage Archives: Link
Tyne and Wear HER(4321): Newcastle, Forth Banks, Goods Station (first)
Tyne and Wear HER(8917): Newcastle, Forth Banks, Goods Station Warehouse (second)
Tyne & Wear Sitelines: Link
A Brief History of the North Eastern Railway: Link Link
Disused Stations - Newcastle Link
Newcastle City Council - Character Statement Link
Planning permission has recently (2011) been granted for the incorporation of the buildings on Forth Banks (Bell's Goods Warehouse and Kings House), along with part of the site of the Goods Station at the rear, into a £37 million new Police Station for Northumbria Police.
Link
Much of this is detailed in the following blog Link