Tidal flood defences, Riverside
Tidal flood defences, Riverside
The walls of a detached private garden have been raised to protect it and the street from tidal flooding. The private access to the foreshore is also seen in SX9372 : Private gate for a Riverside property
Shaldon's tidal flood defences

Shaldon and Ringmore tidal flood defence scheme
Shaldon and Ringmore are neighbouring villages by the Teign estuary. Houses, shops and hotels front the foreshore, reached by lanes and alleyways. There was a risk of tidal flooding to a basin behind the old informal defences, with two near-escapes in October 2004 and March 2008. The £8.3 million tailor-made scheme reduces the risk of tidal flooding to 453 homes and businesses. The Parish Council will operate the flood gates with 40 volunteer flood wardens.

Work started in January 2010 when the Environment Agency’s contractors moved into Shaldon to raise 940 metres of existing foreshore walls, construct 470 metres of new foreshore wall, install ten floodgates and 25 flood windows and doors together with steps and ramps at specific locations. The work is of high quality that fits into the townscape by using local materials. The project employed a number of ground-breaking engineering techniques. Simple-looking walls in places conceal sheet piling that was installed with relatively quiet specialist equipment. Environmental enhancements were undertaken where opportunities allowed. A pumping station and outfall were included to resolve surface water issues.

The scheme was completed in May 2011. It was the first example of ‘Building Trust with Communities’, the Environment Agency’s approach to public engagement. Construction traffic in the villages was reduced by siting the contractor’s main compound at Broadmeadow in Teignmouth across the river. The contractor’s staff won praise from residents for their cheerful and considerate conduct. The flood defences were officially opened on Friday, 1 July 2011. The event marked the end of seven years work by the Environment Agency and its contractors, Interserve.

Funding for the scheme came from the Department for Environment, Food and Rural Affairs (Defra) through the South West Regional Flood Defence Committee. The scheme has won two national awards, a Silver Considerate Contractor Award for the considerate manner in which the works were carried out and an Environment Agency award for Exemplar Safety, Health and Environment Performance. Only four national awards of this level are awarded each year.

Text adapted from the Environment Agency’s website LinkExternal link A report to Teignbridge District Council's Development Control Committee, 28 September 2009, was published as a Google Doc: LinkExternal link For viewing options, right click (PC) or Control+click (Mac).


Creative Commons Licence [Some Rights Reserved]   © Copyright Robin Stott and licensed for reuse under this Creative Commons Licence.
Geographical Context: Boundary, Barrier Village, Rural settlement Housing, Dwellings Estuary, Marine Place: Shaldon Road: Riverside other tags: Flood Wall Flood Defence Click a tag, to view other nearby images.
This photo is linked from: Automatic Clusters: · Street [259] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SX9372, 1944 images   (more nearby 🔍)
Photographer
Robin Stott   (more nearby)
Date Taken
Thursday, 15 September, 2011   (more nearby)
Submitted
Wednesday, 7 December, 2011
Subject Location
OSGB36: geotagged! SX 9340 7238 [10m precision]
WGS84: 50:32.4865N 3:30.3446W
Camera Location
OSGB36: geotagged! SX 9341 7237
View Direction
Northwest (about 315 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Geograph
This page has been viewed about 213 times
You are not logged in login | register