2013

ST9897 : North from Kemble Railway Station, Kemble

taken 11 years ago, near to Kemble, Gloucestershire, England

North from Kemble Railway Station, Kemble
North from Kemble Railway Station, Kemble
This section of the Cheltenham to Swindon line retains its original twin track layout. Soon the section south to Swindon will have it too.
Swindon to Cheltenham Railway

Written by Brian Robert Marshall
The line, also known as the Golden Valley Line, dates back to the early days of railway development in the 19th century. The first section, from Cheltenham to Gloucester, opened in 1840. In 1841 a line was opened from Swindon Junction to Cirencester via Kemble. Then in 1845 a line from Kemble to Gloucester was opened (Kemble became a junction in its own right with branches to Cirencester to the east, and Tetbury to the west both of which closed on the 1960s). At one time there were twenty stations or halts between Cheltenham, at the northern end of the line, and its terminus at Swindon. Now only six remain open (Cheltenham, Gloucester, Stonehouse, Stroud, Kemble and Swindon). In 1968, the hitherto twin track line was butchered by the then British Rail (under a Labour government) and the stretch between Swindon and Kemble was singled (the plan had been to single the entire section between Swindon and Stonehouse but protests led to the abandonment of the project once it had reached Kemble leaving the section from Kemble north to Stonehouse still a twin track). Proposals to restore the twin track between Kemble and Swindon were made in 2008 but were kicked into the long grass by the Office of Rail Regulation (again under a Labour government). Thankfully the Coalition government that took office in 2010 revived the moribund proposal and announced in 2011 that the project could go ahead. Work on the £45m project started in July 2013 and was expected to be completed by Easter 2014. However, on 07 February 2014 Network Rail announced that completion of the project would be put back until August 2014 because "The very high volume of works during Easter nationally, coupled with ongoing remedial work from flooding earlier this year, means our engineering resources will now be operating at full capacity during one of the busiest phases of the Swindon to Kemble redoubling scheme.
"To minimise risk to the work, and avoid the possibility of unnecessary inconvenience to customers, we are now working towards completing the scheme between Swindon and Kemble by August 2014 rather than Easter as originally planned." Anecdotal evidence suggests that the local residents are looking forward to a considerable hike in property values as the increased rail traffic that will be enabled by the doubling of the line will make the all-important London Paddington destination even more accessible.
Sources: LinkExternal link
LinkExternal link
LinkExternal link
LinkExternal link
LinkExternal link
LinkExternal link (pdf)
LinkExternal link


Creative Commons Licence [Some Rights Reserved]   © Copyright Brian Robert Marshall and licensed for reuse under this Creative Commons Licence.
Geographical Context: Village, Rural settlement Railways People, Events other tags: Railway Train Station Railway Station Click a tag, to view other nearby images.
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
ST9897, 276 images   (more nearby 🔍)
Photographer
Brian Robert Marshall   (more nearby)
Date Taken
Friday, 23 August, 2013   (more nearby)
Submitted
Sunday, 25 August, 2013
Subject Location
OSGB36: geotagged! ST 984 976 [100m precision]
WGS84: 51:40.6676N 2:1.4116W
Camera Location
OSGB36: geotagged! ST 984 975
View Direction
NORTH (about 0 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Geograph
This page has been viewed about 74 times
You are not logged in login | register