SD3041 : Constructing Underwater Sewer Outfall at Anchorsholme

taken 1 year ago, near to Cleveleys, Lancashire, Great Britain

Constructing Underwater Sewer Outfall at Anchorsholme
Constructing Underwater Sewer Outfall at Anchorsholme
United Utilities is building a new stormwater pumping station and 3.75 km long sea outfall at Anchorsholme, Blackpool, in order to enhance the sewer network in Blackpool and help the bathing waters of the Fylde Coast to meet European regulations. The new facilities will replace an existing pumping station and shorter pipe, located on the sea front at the end of Anchorsholme Lane West.

The new outfall pipe will be used during periods of heavy rain to pump storm water away from the sewer network. This will not only help prevent flooding of properties, but with the storm water being pumped so far out into sea (the current outfall pipe is only 1km in length), it will help to protect bathing waters. The project involves the construction of a new pumping station within Anchorsholme Park. The new outfall pipe which will pass from there, beneath the sea wall, is being installed in a trench beneath the beach and out to sea. United Utilities work should be finished in 2019 and a completely revamped Anchorsholme Park is expected to be re-opened in 2020, boasting a new bowling club, a café, outdoor seating area, children’s playground, sports area with tennis courts and a trim trail.

LinkExternal link Live Blackpool
LinkExternal link United Utilities Non-Technical Summary of the Environmental Statement
LinkExternal link United Utilities

See other images of Sewer Outfall Construction at Anchorsholme
Creative Commons Licence [Some Rights Reserved]   © Copyright David Dixon and licensed for reuse under this Creative Commons Licence.
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for Large scale mapping
Change to interactive Map >
Grid Square
SD3041, 8 images   (more nearby )
Photographer
  (find more nearby)
Date Taken
Sunday, 13 August, 2017   (more nearby)
Submitted
Wednesday, 23 August, 2017
Geographical Context
Coastal  Construction, Development  Waste, Waste management 
Camera (from Tags)
Panasonic DMC-G7 
Subject Location
OSGB36: geotagged! SD 303 417 [100m precision]
WGS84: 53:52.0087N 3:3.6845W
Camera Location
OSGB36: geotagged! SD 311 418
View Direction
WEST (about 270 degrees)
Looking for a postcode? Try this pageExternal link
Clickable map
+

Other Tags
Sea  United Utilities  Sewer Outfall  Construction Work 

Click a tag, to view other nearby images.

Image Type (about): cross grid 
This page has been viewed about 30 times.
View this location: KML (Google Earth) · Google MapsExternal link · Bing MapsExternal link · OS Map Checksheet · Geograph Map · geotagged! More Links for this image
NW N NE
W Go E
SW S SE
[Mark
You are not logged in login | register