2017

SN7376 : Number 8, Llewelyn, arrives at Devil's Bridge

taken 7 years ago, near to Devil's Bridge, Ceredigion/Sir Ceredigion, Wales

Number 8, Llewelyn, arrives at Devil's Bridge
Number 8, Llewelyn, arrives at Devil's Bridge
Styled in GWR green, number 8 locomotive arrives at Devil's Bridge. Previously it was known as Llewelyn.
The Vale of Rheidol Railway (Rheilffordd Cwm Rheidol)

The Vale of Rheidol Railway (Rheilffordd Cwm Rheidol) is a 1 ft 11 ¾ in narrow gauge heritage railway that runs for 11 ¾ miles between the coast at Aberystwyth and Devil's Bridge in the Cambrian Mountains.

The line opened in 1902 to carry lead ore, timber and passenger traffic. At the time of building, it was of the most up to date standard of narrow gauge construction, and passed through terrain where it would have been almost impossible to build a standard gauge line without prohibitive costs. The narrow track gauge allows the railway to follow the contours of the hillside with many sharp curves and steep gradients which add to the railway's charm.

At the height of the lines prosperity, in 1912, consideration was given to converting the line to electric traction, using hydro-electric power from the River Rheidol. However, control of the line passed to the Cambrian Railways in the same year and plans were shelved. Following the Great War, a decline in mine traffic was balanced somewhat by a growing tourist trade. In 1923 Cambrian Railways were themselves absorbed by the Great Western Railway and goods services were withdrawn completely, and the harbour branch at Aberystwyth closed. The winter passenger service was withdrawn in 1930, and the line closed completely from the end of the 1939 summer service for the duration of the Second World War. Ownership of the line passed to British Railways in 1948, and it survived through threats of closure to become the last sole steam-operated railway operated by British Rail; steam traction having ceased in 1968 on all other parts of the network.

The railway is now owned by a charitable trust. The locomotives and carriages currently in use were built for the line by the Great Western Railway between 1923 and 1938.

LinkExternal link Vale of Rheidol railway website


Creative Commons Licence [Some Rights Reserved]   © Copyright Richard Hoare and licensed for reuse under this Creative Commons Licence.
This photo is linked from: Automatic Clusters: · Locomotives at Devil's Bridge [56] · Arrival at Devil's Bridge [34] · Llewelyn [6] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SN7376, 318 images   (more nearby 🔍)
Photographer
Richard Hoare   (more nearby)
Date Taken
Thursday, 7 September, 2017   (more nearby)
Submitted
Sunday, 17 September, 2017
Subject Location
OSGB36: geotagged! SN 7374 7694 [10m precision]
WGS84: 52:22.5543N 3:51.3719W
Camera Location
OSGB36: geotagged! SN 7383 7694
View Direction
WEST (about 270 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image Type (about): geograph 
This page has been viewed about 66 times
You are not logged in login | register