2019
TL2371 : Under Huntingdon Viaduct
taken 5 years ago, near to Huntingdon, Cambridgeshire, England
Under Huntingdon Viaduct
Exposed steel reinforcement in the concrete. The pre-stressed concrete flyover carries the A14 over the East Coast Main Line and a B road. It was built in 1975 but has had problems with weak half joints in the main cantilever span. Strengthening work in 2003 had a design life of twelve years. It will be closed next year after the new A14 opens.
This page has been
viewed about
52 times