TA1028 : Humber: Hull Frontage Flood Defence Improvements

taken 6 years ago, near to Kingston Upon Hull, England

Humber: Hull Frontage Flood Defence Improvements
Humber: Hull Frontage Flood Defence Improvements
Planning permission was granted in November 2019 to improve the flood defences on Nelson Street/Victoria Pier. The existing flood defences - in the form of steel sheet piles - have reached the end of their useful life. The improvement work will involve the installation of new steel sheet piles along the estuary frontage. Further information from the Environment Agency: LinkExternal link (Archive LinkExternal link ) Depicted are works being undertaken between Victoria Pier and the horse wash. Whilst work is in progress, Nelson Street is closed except for pedestrian access to the premises on the north side of the street.
Flood Alleviation Schemes in Kingston upon Hull

In Kingston upon Hull, one of the biggest challenges faced is having enough space to store water during heavy or prolonged rainfall, and then moving water through and out of the city. Due to the low-lying nature of the city, water cannot naturally drain. It must be pumped out. Flood risk is managed in a variety of ways by the risk management authorities responsible. There are schemes all over the city acting to reduce the risk of flooding.

Aboveground Structures: The Tidal Surge Barrier reduces the risk of a tidal storm surge from coming up the River Hull from the Humber Estuary. Humber Hull Frontages - reducing the risk of a tidal storm surge from coming up the Humber Estuary. River Hull defences reduce the risk of fluvial or river flooding from the River Hull. These are potentially caused by increased flows coming from upstream.

Underground Structures: Culverts - moving water underground in pipes from one location to another. Gullies - taking water from highways and roads to reduce flood risk of surface water flooding.

Sewers and Pumping Stations: The sewers transport foul waste and surface water to east Hull wastewater treatment works. The pumping stations help the water move through the sewers. It is discharged into the Humber Estuary.

Sewers: Moving surface and wastewater underground to wastewater treatment works before being discharged into the Humber.

Bransholme Pumping Station: A surface water storage site and pumping station with the largest Archimedes screw pumps in Europe. It reduces the risk of sewer and surface water flooding in North Hull. This is done by delivering water from the storm sewer network to the River Hull.

East Hull Pumping Station: Four pumps installed to reduce the risk of fluvial or river flooding from the Holderness Drain. This is done by pumping water from the drain out into the Humber Estuary during high tide. Further information: LinkExternal link

Nature-based Solutions: The Aquagreen Flood Alleviation Scheme is a nature-based solution to managing flood risk. This is done with Surface Water Storage areas. They fill during heavy or prolonged rainfall. This can reduce the risk of flooding as it slows the flow of surface water into the drainage system. Another benefit of this is that it also improves community green spaces. By giving space back to nature, more space is made for water.

Further reading:
Kingston upon Hull City Council: LinkExternal link

Flood Alleviation Scheme: Humber – Hull Frontages Flood Defence

Improved flood defences along the Humber Estuary frontage have been constructed from St Andrew's Quay in the west to Victoria Dock Village in the east. Further information from the Environment Agency: LinkExternal link


Creative Commons Licence [Some Rights Reserved]   © Copyright Bernard Sharp and licensed for reuse under this Creative Commons Licence.
Geographical Context: Housing, Dwellings Business, Retail, Services City, Town centre Construction, Development Estuary, Marine other tags: Conservation Area Click a tag, to view other nearby images.
This photo is linked from: Automatic Clusters: · Hull [2696] · Street [1675] · Victoria Dock [589] Title Clusters: · Humber: Hull Frontage Flood Defence Improvements [16] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
TA1028, 3836 images   (more nearby 🔍)
Photographer
Bernard Sharp   (more nearby)
Date Taken
Wednesday, 19 August, 2020   (more nearby)
Submitted
Friday, 21 August, 2020
Subject Location
OSGB36: geotagged! TA 1003 2810 [10m precision]
WGS84: 53:44.2611N 0:20.0010W
Camera Location
OSGB36: geotagged! TA 1016 2817
View Direction
West-southwest (about 247 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image Type (about): geograph 
This page has been viewed about 57 times