2008
SD8118 : Nearly There
taken 19 years ago, near to Edenfield, Lancashire, England

Nearly There.
After snaking their way up the steep hill from Turn Village these two sections of turbine tower are nearly at their destination.
SD8118 : Two turbine tower sections heading for Scout Moor
SD7921 : Turbine tower sections heading for Scout Moor
SD8418 : Turbine Tower No 18 under construction
SD8318 : Scout Moor Turbine Tower No 16 under construction
SD8418 : Top section of turbine tower 21 being lifted into position
SD8418 : The very first completed wind turbine on Scout Moor
Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80
Scout Moor Wind Farm Picture Gallery
Link
SD8118 : Two turbine tower sections heading for Scout Moor
SD7921 : Turbine tower sections heading for Scout Moor
SD8418 : Turbine Tower No 18 under construction
SD8318 : Scout Moor Turbine Tower No 16 under construction
SD8418 : Top section of turbine tower 21 being lifted into position
SD8418 : The very first completed wind turbine on Scout Moor
Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80
Scout Moor Wind Farm Picture Gallery
Link
