2008

SD8417 : Working on the hub 60 metres up

taken 19 years ago, near to Cheesden, Rochdale, England

Working on the hub 60 metres up.
Working on the hub 60 metres up.
The engineer works on the hub of tower No 10 after the blades were fitted earlier in the day.
The only way to access the interior workings of the hub is by opening the roof of the nacelle and crawling along one of the set of fixed ladders attached to the side of the hub.
Quite an experience I would think and not one for the faint hearted especially being 60 metres up from the ground.

Following a public inquiry held in 2004, planning consent was granted by the Secretary of State on the 25th May 2005 for the building of Scout Moor Wind Farm.
Construction of the wind turbines began back in November 2007 at Turbine No 16.
By June 2008 engineers had constructed 26 wind turbine towers and installed 78 turbine blades 450 metres above sea level on Scout Moor amid adverse weather conditions of thick fog, gale force winds, torrential rain, snow and ice during the winter months of 2008.

On the 25th of September 2008 dignitaries from across the North West were invited to the official opening of the Scout Moor wind farm.
Children from Edenfield Primary School, who have enjoyed lessons based around the wind farm, were on hand to cut the ribbon at Turbine No 22.Link
Head Teacher at Edenfield Primary School, Janet Reidy, said: "It was superb for the children to be involved after all the work they had done about the wind farm in their lessons.
I think they will all remember this in future years and now they know what it's like to be film stars with all the camera crews there!"

Richard Dibley, wind power development manager at Peel, said at the opening: "We have welcomed people here today to thank them for their patience and understanding during the construction period and for them to see the wind farm in action at close quarters. I think we have chosen the perfect site here as it is more than 50% windier up here than it is in the surrounding area. These turbines will be generating power for years to come using a natural resource that will never run out."

SD8417 : Turbine Tower No 10 under construction
SD8418 : Turbine Tower No 18 under construction
SD8318 : Scout Moor Turbine Tower No 16 under construction
SD8418 : Top section of turbine tower 21 being lifted into position
SD8418 : The very first completed wind turbine on Scout Moor

Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80
Scout Moor Wind Farm Picture Gallery Link

Creative Commons Licence [Some Rights Reserved]   © Copyright Paul Anderson and licensed for reuse under this Creative Commons Licence.
Category: Wind turbines Wind Turbines Wind Turbine Scout Moor Scout Moor Wind Farm Turbine Blade Click a tag, to view other nearby images.
This photo is linked from: Galleries: · Scout Moor Wind Farm Under Construction · Scout Moor Wind Farm Under Construction · Scout Moor Wind Farm Under Construction · Scout Moor Wind Farm Under Construction Automatic Clusters: · Tower No 10 [9] · Ice during the Winter Months of 2008 [8] · Works on the Hub [4] · Faint Hearted Especially being 60 Metres [2] Other Photos: · Cables Away on Tower No 16 · Turbine blade hub going up. · Connecting the blade hub · Top section of turbine tower 21 being lifted into position · Top section of tower 21 is locked into position · The first blade being lifted into position · The first blades arrive on site at tower number 21 · One hundred and twenty feet up! · Eight tons and forty metres long. · Nearly there · Connecting blade to the hub · First blade is attached to Turbine No 21 · One up two to go! · Freezing weather conditions on Scout Moor · Inside the nacelle of Tower No 18 · Scout Moor Wind Farm from M62 · Turbine Tower No 10 under construction · View from the top of Turbine Tower No 10 looking North East · Turbine Tower No 10 nears completion · Scout Moor Turbine Towers 15 and 21 · Turbine Towers 15 and 10 · Scout Moor Wind Turbines and Knowl Hill · View from the top of Turbine Tower No 10 looking North · Scout Moor Wind Farm Tower No 10 under construction · Working 60 metres up on Turbine Tower No 10 · Ramsbottom and Scout Moor Wind Farm · Wind Turbines on Scout Moor · Wind Turbine blade delivery passing through Edenfield · Rochdale Road Edenfield · Scout Moor Wind Farm from Naden Reservoirs · Scout Moor Wind Farm under construction · Attaching cables to centre section of Tower No 8 · Scout Moor Wind Farm Tower No 8 under construction · Wind Turbine with a view · Turbine Tower No 8 under construction · Base section of Tower No 8 · Scout Moor Wind Farm · Scout Moor Wind Farm Tower No 7 under construction · Installing the base section of Tower No 7 · Scout Moor Wind Farm Tower No 7 under construction · Just a few more inches · Centre section for Tower No 7 arrives on Scout Moor · Scout Moor access road · Scout Moor Turbine Towers 15, 10 and 9 · Construction begins on Turbine Tower No 7 · Scout Moor Wind Farm TurbineTower No 12 · Centre section for Tower No 7 awaits unloading · Completed Turbine Towers 8 and 12 on Scout Moor · Scout Moor Turbine Tower No 8 under construction · Construction begins on Turbine Tower No 8 · Turbine Tower No 8 under construction · Scout Moor Wind Farm Tower No 9 · Attaching cables to lift centre section of Tower No 8 · Turbine Towers 25,19 and 18 on Scout Moor · Completed Turbine Tower No 6 on Scout Moor · Moving on · Turbine Tower No 6 on Scout Moor · Turbine Tower No 16 · Turbine Tower Base No 3 on Scout Moor · Scout Moor Wind Farm under construction Tower No 3 · Turbine Tower No 9 overlooking Rochdale · Scout Moor Wind Farm Turbines 19 and 18 · Scout Moor Wind Farm Turbine Tower No 6 · Scout Moor Wind Farm Turbines 21 and 25 · Scout Moor Wind Farm Turbines 9,10 and 15 · Wind Turbine sections enroute to Scout Moor · Scout Moor Turbine No 3 under construction · Interior of the hub of Turbine No 3 · Hub for Turbine Tower No 3 · Scout Moor Wind Turbine No 25 goes live · Turbine Convoy passing through Bridge Mills · Turbine Tower Sections on the A56 · Turbine Tower No 3 under construction on Scout Moor · Gearbox , Rotor Shaft and Disk Brake Assembly for Turbine No 3 · Scout Moor Wind Farm Turbines 1,7,8 and 3 · Scout Moor Wind Farm Turbine Tower No 1 · Scout Moor Wind Farm · Turbine Tower No 9 overlooking Rochdale town centre · Turbine Tower No 15 during testing · Scout Moor Wind Farm · Turbine Tower No 5 under construction · Turbine Tower No 12 on Scout Moor · Turbine Tower No 1 · Knowl Hill and Scout Moor Wind Farm · Turbine Base No 17 and Ashworth Moor Reservoir · Tower section passing Whittle Hill · Scout Moor Wind Farm Turbine Tower No 2 · Scout Moor Turbine Towers 4 and 2 · Aerial View of Scout Moor Wind Farm Turbine No 2 · A Sleeping Giant · 54 Tons and 22 metres Long · Turbine Tower No 11 under construction · Gearbox , Rotor Shaft and Disk Brake Assembly for Turbine No 11 · Turbine Tower No 11 under construction · Turbine Tower No 11 construction site · Scout Moor Wind Farm Turbine Tower No 14 · Gearbox , Rotor Shaft and Disk Brake Assembly for Turbine No 11 · Engineers 60 metres up on top of Turbine Tower No 11 · Almost there · Just a few inches more · Turbine Tower No 11 during construction in May 2008 · Crane on site of Turbine Tower No 11 · Preparing Turbine Blade for Lifting · First Blade for Turbine Tower No 11 · Nearly There · The First Blade for Turbine No 11 in Position · Second Blade is Attached to Turbine Tower No 11 · Completed Turbine Tower No 11 on Scout Moor · Second Turbine Blade Delivery to Tower No 11 · Turbine Tower No 2 · Scout Moor Wind Farm May 2008 · Preparing Gearbox, Rotor Shaft and Disk Brake for Lifting · Attaching Nacelle to top of Turbine Tower No 11 · Scout Moor Turbine Towers 11 and 14 · Turbine Tower No 24 under construction · Turbine Tower No 24 during construction in May 2008 · Turbine Base and Transformer of Tower No 24 · Turbine Tower No 24 Under Construction in May 2008 · Just a few more inches · Turbine Tower No 24 under construction · Tightening the bolts at Turbine No 24 · Turbine Tower No 22 under construction · Attaching First Blade to Turbine No 22 · Turbine Convoy enroute to Scout Moor · Turbine Convoy passing Ramsbottom on the M66 · Turbine Tower No 22 construction site · Turbine Tower No 22 construction site · Scout Moor Wind Farm · Turbine Tower section delivery · Turbine Tower section delivery · Turbine Tower No 20 under construction · Met Mast under construction on Scout Moor · Turbine Towers 22 and 24 at Scout Moor · Turbine Tower No 20 under construction · Turbine Tower No 26 construction site · Middle section for Tower No 26 · Middle section for Tower No 26 arrives on site · Last Turbine Tower Delivery to Scout Moor · Completed Turbine Tower No 26 on Scout Moor · Nacelle of Turbine Tower No 26 · Turbine Tower No 17 during construction in June 2008 · Turbine Tower No 17 under construction on Scout Moor · Top section for Turbine No 17 arrives on site. · Engineers prepare tower section for lifting · Engineers connecting lifting cables to tower section · Top section of Turbine No 17 . · Turbine Tower No 17 under construction on Scout Moor · Turbine No 26 from Whittle Pike · Scout Moor Wind Farm June 2008 · Turbine No 20 on Scout Moor · Construction Crew of Turbine No 23 on Scout Moor · Turbine Blade Delivery to Tower No 23 · Hub of Turbine No 23 · Ground crew at Turbine No 23 on Scout Moor · Completed Turbine Tower No 23 on Scout Moor · Turbine Tower No 2 during testing · Engineer working on the hub of Turbine No 2 · Working on the Hub of Turbine No 2 at Scout Moor · Turbine No 16 in Full Flight · Scout Moor Wind Farm East · Turbine Towers 19 and 18 under test on Scout Moor · Preparing nacelle for lifting at Turbine No 11 · Preparing Turbine Hub for Installation · Working on the Hub of Turbine No 11 at Scout Moor · Turbine Tower No 20 under construction · Turbine Tower No 26 Under Construction in May 2008 · Turbine Tower Convoy on the A680 · Wind Farm Electricity Sub Station · Scout Moor Wind Farm June 2008 · Turbine No 16 under construction on Scout Moor · Turbine Tower No 11 under construction · Gearbox , Rotor Shaft and Disk Brake Assembly · Scout Moor Quarry · Top tower section for Turbine No 17 arrives on site · Nacelle en route to Scout Moor Wind Farm · Turbine Blade Delivery to Tower No 23 · Scout Moor Wind Farm Official Opening (1) · Scout Moor Wind Farm Official Opening (2) · Scout Moor Wind Farm Official Opening (3) · Scout Moor Wind Farm Official Opening (4) · Interior of the hub of Turbine No 3 · Scout Moor Wind Turbine No 3 under construction · Turbine Tower section delivery on Scout Moor · Transformer of Turbine No 5 · The Official Opening of Scout Moor Wind Farm · BBC Outside Broadcast Unit · Working on the Hub of Turbine No 11 at Scout Moor · Scout Moor Wind Farm · Turbine Towers 19 and 18 on Scout Moor · Installing Base Section of Tower No 24 · Attaching Turbine Blade · Installing Gearbox Assembly at Turbine No 11 · A Rainy Day in Edenfield · Working on the Hub of Turbine No 2 at Scout Moor · Turbine Towers 2 and 4 on Scout Moor · Scout Moor Wind Farm Turbine Tower No's 1 and 7 · Start of Construction at Scout Moor · Hub of Turbine No 1 at Scout Moor · Turbine Convoy passing Edenfield Methodist Church · Turbine Tower No 26 construction site · Installing Gearbox , Rotor Shaft and Disk Brake Assembly · Installing Gearbox , Rotor Shaft and Disk Brake Assembly · Scout Moor Wind Farm Turbine Towers 12 and 16 · Turbine Tower No 20 during construction · Turbine Tower No 17 during construction in June 2008 · Scout Moor Wind Farm Turbine Towers · Turbine Tower No 11 under construction · Scout Moor Wind Turbine No 25 goes live · Turbine Tower Convoy · Turbine No 21 at Sunset · Turbine No 21 under construction · Gearbox for Turbine No 21 · Sunset on Scout Moor · Turbine No 26 on Scout Moor · Turbine No 23 and Access Road · Wind Turbines on Scout Moor · Turbines at Sunset · Turbine No 21 on Scout Moor · Winter Sun on Scout Moor · Scout Moor in Winter · Turbine No 16 and Met Mast · Scout Moor Wind Farm Turbine Tower No 12 · Scout Moor Wind Farm · Wide Load on the A680 · Engineers prepare tower section for lifting · Turbine Towers 13 and 11 · Turbine Tower Convoy on Rochdale Road · Scout Moor Wind Farm Turbine Tower No 14 · The Final Turbine Tower Delivery to Scout Moor · Scout Moor Wind Farm in Winter · Turbine Tower No 8 Under Construction · Turbine Tower No 8 Under Construction ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SD8417, 33 images   (more nearby 🔍)
Photographer
Paul Anderson   (more nearby)
Date Taken
Monday, 18 February, 2008   (more nearby)
Submitted
Tuesday, 19 February, 2008
Subject Location
OSGB36: geotagged! SD 841 178 [100m precision]
WGS84: 53:39.4032N 2:14.4509W
Camera Location
OSGB36: geotagged! SD 841 178
View Direction
EAST (about 90 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image classification(about): Supplemental image
This page has been viewed about 5153 times