A bridge so far
A bridge so far
The NAV2 section is now on its pier while the NAV3 section is still on the barge awaiting being raised onto its pier and connected to NAV2.
Previously TM5392 : The Gull wing bridge abutments and crane
NAV3 in place TM5392 : A bridge so far
Gull Wing Bridge at Lowestoft

Before 1827 there was no way from the sea to Lake Lothing which was a body of fresh water, but work to cut a channel from the sea was started in 1827 to create a navigable inland canal for ships from Lowestoft to sail to Norwich, much opposed by the people and the port of Great Yarmouth who lost their monopoly.
The first Harbour Bridge was opened for traffic on the 9th of June 1830, but was immediately found to be inadequate, being a static bridge and too narrow to allow larger ships through, reducing tolls, and the company was bailed out by the government in 1842. In 1846 the government sold it to another failed venture until it was purchased by the 33-year-old Morton Peto. He was an engineer and entrepreneur who built an international career around huge infrastructure projects involving rail, sewers, ports and everything that tied them all together. Lowestoft saw many infrastructure additions and improvements included piers and sheltered inner harbours, and of course, a new bridge, a swing bridge, which connected the two sides of the canal.
Growth was so rapid that it soon became obvious that a new wider bridge was needed. A second swing bridge opened in 1897, the canal having been widened and the new bridge which was 116 feet (35½ metres) long was built to span it.
It too was rapidly redundant but the First World War badly affected the fishing industry and by the time the Second World War was over nothing had changed and money for bridges was short with housing the top priority.
However in 1970 things changed, the swing bridge was demolished and for two years a ferry was the only alternative to the Mutford (mud ford) crossing in Oulton Broad. In March of 1972 the "new" second-hand Bascule Bridge was officially opened. Although it had an expected lifespan of 30 years, it too was obsolete the following day. It was refurbished in 2008 at a cost of £2.8 million. After which it was, on average, unusable for three days each month, either by failing to open or failing to close.


Creative Commons Licence [Some Rights Reserved]   © Copyright Adrian S Pye and licensed for reuse under this Creative Commons Licence.
Geographical Context: Roads, Road transport Docks, Harbours
This photo is linked from: Automatic Clusters: · NAV3 Section [2] Other Photos: · The Gull wing bridge abutments and crane · A bridge so far · A bridge so far from the north Title Clusters: · A bridge so far [3] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
TM5392, 92 images   (more nearby 🔍)
Photographer
Adrian S Pye   (more nearby)
Date Taken
Sunday, 2 April, 2023   (more nearby)
Submitted
Sunday, 2 April, 2023
Subject Location
OSGB36: geotagged! TM 5383 9284 [10m precision]
WGS84: 52:28.4649N 1:44.1719E
Camera Location
OSGB36: geotagged! TM 5411 9262
View Direction
Northwest (about 315 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image Type (about): cross grid 
This page has been viewed about 89 times