2024

TM5392 : A train passes under the gull wing bridge

taken 3 years ago, near to Lowestoft, Suffolk, England

A train passes under the gull wing bridge
A train passes under the gull wing bridge
A three-week temporary closure of Lake Lothing’s navigation channel is in operation while the main bascule span is installed.
The trains are unaffected by all the work going on while the counter-balance bascule spans are being lifted into place. TM5392 : A bridge so far - Lowestoft Gull wing bridge taking shape
Gull Wing Bridge at Lowestoft

Before 1827 there was no way from the sea to Lake Lothing which was a body of fresh water, but work to cut a channel from the sea was started in 1827 to create a navigable inland canal for ships from Lowestoft to sail to Norwich, much opposed by the people and the port of Great Yarmouth who lost their monopoly.
The first Harbour Bridge was opened for traffic on the 9th of June 1830, but was immediately found to be inadequate, being a static bridge and too narrow to allow larger ships through, reducing tolls, and the company was bailed out by the government in 1842. In 1846 the government sold it to another failed venture until it was purchased by the 33-year-old Morton Peto. He was an engineer and entrepreneur who built an international career around huge infrastructure projects involving rail, sewers, ports and everything that tied them all together. Lowestoft saw many infrastructure additions and improvements included piers and sheltered inner harbours, and of course, a new bridge, a swing bridge, which connected the two sides of the canal.
Growth was so rapid that it soon became obvious that a new wider bridge was needed. A second swing bridge opened in 1897, the canal having been widened and the new bridge which was 116 feet (35½ metres) long was built to span it.
It too was rapidly redundant but the First World War badly affected the fishing industry and by the time the Second World War was over nothing had changed and money for bridges was short with housing the top priority.
However in 1970 things changed, the swing bridge was demolished and for two years a ferry was the only alternative to the Mutford (mud ford) crossing in Oulton Broad. In March of 1972 the "new" second-hand Bascule Bridge was officially opened. Although it had an expected lifespan of 30 years, it too was obsolete the following day. It was refurbished in 2008 at a cost of £2.8 million. After which it was, on average, unusable for three days each month, either by failing to open or failing to close.


Creative Commons Licence [Some Rights Reserved]   © Copyright Adrian S Pye and licensed for reuse under this Creative Commons Licence.
This photo is linked from: Automatic Clusters: · Gull Wing Bridge [16] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
TM5392, 92 images   (more nearby 🔍)
Photographer
Adrian S Pye   (more nearby)
Date Taken
Saturday, 9 March, 2024   (more nearby)
Submitted
Saturday, 9 March, 2024
Subject Location
OSGB36: geotagged! TM 5390 9291 [10m precision]
WGS84: 52:28.5006N 1:44.2368E
Camera Location
OSGB36: geotagged! TM 53969 92924
View Direction
West-southwest (about 247 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image Type (about): geograph 
This page has been viewed about 146 times