TA1328 : East Hull Pumping Station, Kingston upon Hull
taken 1 year ago, near to Marfleet, Kingston Upon Hull, England

In Kingston upon Hull, one of the biggest challenges faced is having enough space to store water during heavy or prolonged rainfall, and then moving water through and out of the city. Due to the low-lying nature of the city, water cannot naturally drain. It must be pumped out. Flood risk is managed in a variety of ways by the risk management authorities responsible. There are schemes all over the city acting to reduce the risk of flooding.
Aboveground Structures: The Tidal Surge Barrier reduces the risk of a tidal storm surge from coming up the River Hull from the Humber Estuary. Humber Hull Frontages - reducing the risk of a tidal storm surge from coming up the Humber Estuary. River Hull defences reduce the risk of fluvial or river flooding from the River Hull. These are potentially caused by increased flows coming from upstream.
Underground Structures: Culverts - moving water underground in pipes from one location to another. Gullies - taking water from highways and roads to reduce flood risk of surface water flooding.
Sewers and Pumping Stations: The sewers transport foul waste and surface water to east Hull wastewater treatment works. The pumping stations help the water move through the sewers. It is discharged into the Humber Estuary.
Sewers: Moving surface and wastewater underground to wastewater treatment works before being discharged into the Humber.
Bransholme Pumping Station: A surface water storage site and pumping station with the largest Archimedes screw pumps in Europe. It reduces the risk of sewer and surface water flooding in North Hull. This is done by delivering water from the storm sewer network to the River Hull.
East Hull Pumping Station: Four pumps installed to reduce the risk of fluvial or river flooding from the Holderness Drain. This is done by pumping water from the drain out into the Humber Estuary during high tide. Further information: Link
Nature-based Solutions: The Aquagreen Flood Alleviation Scheme is a nature-based solution to managing flood risk. This is done with Surface Water Storage areas. They fill during heavy or prolonged rainfall. This can reduce the risk of flooding as it slows the flow of surface water into the drainage system. Another benefit of this is that it also improves community green spaces. By giving space back to nature, more space is made for water.
Further reading:
Kingston upon Hull City Council: Link
Bransholme Surface Water Pumping Station (SWPS): A surface water storage site and pumping station with the largest Archimedes screw pumps in Europe. It reduces the risk of sewer and surface water flooding in North Hull. This is done by delivering water from the storm sewer network to the River Hull. Located in Selset Way in Kingswood, it became operational in July 2016. Further information: Link
![]()
East Hull Pumping Station: Four pumps installed to reduce the risk of fluvial or river flooding from the Holderness Drain. This is done by pumping water from the drain out into the Humber Estuary during high tide. Completed in 2024, the new pumping station, at the confluence of the drain and the estuary, replaced that built 1949 which had failed and was in disrepair on the west side of Holderness Drain near Hedon Road. Further reading: Link
Holderness Drain is a flood alleviation scheme to mitigate regular Winter flooding, where a meandering watercourse called ‘fleet’ per the Marfleet Enclosure Plan of 1766, was straightened. Its original course delineated the boundary between the parishes of Southcoates and Marfleet in today’s Kingston upon Hull. Its southernmost point then was the Humber Bank abutting the Humber Estuary. Following the construction of Alexandra Dock and King George Dock, it continues to flow into the estuary, but further south than hitherto. Construction began in 1764, with the outlet at the Humber finally authorised in 1832. For a detailed history, see Wikipedia: Link
The Holderness Drain History and Wildlife Trail, completed 2025, is an integral part of Hull’s Dynamic Drains project, which aims to improve the city’s urban watercourses, boost wildlife habitats and encourage people to connect with their natural environment. Along the way people can find out more about the local history from a signboard at each of the 12 bridges crossing the drain and spot some wildlife native to the location. From north to south, the bridges are located at: 1: North’s Bridge, East Carr Road Link 2: Saltshouse Road Link 3: Holderness Road Link 4: Marfleet Lane Link 5: Maybury Road Link 6: Portobello Street Link 7: Preston Road Link 8: St John’s Grove Link 9: Former Withernsea branch railway Link 10: Hedon Road Link 11: Footpath/cycleway near Corporation Road Link 12: Humber Estuary tidal doors Link Vickerman’s Bridge, between nos. 8 and 9, no longer exists, but the supports remain on both banks.
Further reading:
Kingston upon Hull City Council: Link
Environment Agency: Link