SE3734 : Thorpe Park housing: Ashbourne Avenue (2)

taken 6 months ago, near to Pendas Fields, Leeds, England

Thorpe Park housing: Ashbourne Avenue (2)
Thorpe Park housing: Ashbourne Avenue (2)
There is a gap between houses to provide a shared parking area. Beyond that, a tall wooden fence provides a degree of sound reduction from trains on the railway immediately beyond. Note the part completed electrification gantry as part of the Trans Pennine Route Upgrade.

Creative Commons Licence [Some Rights Reserved]   © Copyright Stephen Craven and licensed for reuse under this Creative Commons Licence.
Thorpe Park, Leeds :: SE3733

Thorpe Park is a large infill development between the old Ring Road and the newer East Leeds Orbital Route, on the eastern edge of the Leeds conurbation. It is roughly divided into five zones: the largest part to the south is commercial, the northern edge either side of the Leeds-York rail line is housing, between them a retail and leisure park ('The Springs'), east of the ELOR will be a logistics park, and to the west former agricultural land will become a park and sports area.

Construction started in the early 21st century and is still continuing as of 2026, with more housing, light industry and parkland still planned. When complete, it will comprise 3 million square feet of business space, 350,000 sq ft of retail and leisure amenities, 750 homes and apartments, and 60 hectares of public green spaces.

There is an ambition, in conjunction with the West Yorkshire Combined Authority, eventually to build a new park-and-ride rail station to attract traffic into the city from the M1, as well as provide a more convenient commuter service for residents of the area. Figures from the official website, LinkExternal link

Transpennine Route Upgrade (TRU) (provided by DS Pugh)

The Transpennine railway line runs between York and Manchester via Leeds, Huddersfield and Stalybridge. The line is seeing work to increase the capacity of the line, including quad-tracking the line between Dewsbury and Huddersfield, along with electrification along the length of the line. For more information on the project see: LinkExternal link
There are also two excellent YouTube channels documenting the TRU works every few days. Sarah Bell documents mostly at street level: LinkExternal link and On Track With Tim is predominantly drone footage: LinkExternal link



Key works (east to west):

York to Leeds
Electrification and track upgrades between Colton Junction (with the East Coast Mainline) and Leeds. Includes rebuilding of platforms 3 & 4 at Church Fenton to allow for improved track alignment, raising/rebuilding of many bridges and removal of several level crossings along the route. The route includes Neville Hill depot to the east of Leeds, which sees major works, along with the relocation of electric multiple units to a new Shipley Traincare Depot.

Leeds to Dewsbury
Electrification of the line and rebuilding of Morley station slightly further from the tunnel mouth.

Dewsbury to Huddersfield
Quad tracking of the line with electrification. The construction of the Baker Viaduct over the River Calder and Calder and Hebble Navigation between Dewsbury and Ravensthorpe, with a grade separated junction with the lines from Wakefield at Thornhill Junction. Relocation of Ravensthorpe Station and major station rebuilds for Mirfield and Deighton. The installation of the fast lines takes an improved alignment, especially around Heaton Lodge Junction.

Huddersfield Station
Major works to the station, with a revised track layout and reconfigured and lengthened platforms. Repairs to the roof covering the station.

Huddersfield to Diggle
Electrification of the lines, including through Standedge Tunnel. Rebuilding of Marsden station and works to Slaithwaite station.

Diggle to Stalybridge
Electrification of the lines with relocation of Mossley station and upgrades to Greenfield station.

Stalybridge to Manchester Victoria
Reconfiguration for the route to Manchester Victoria becoming the main route on the line with Manchester Piccadilly becoming the secondary route. Both routes fully electrified.


As well as the core Transpennine route, additional upgrade works were undertaken on some key diversionary routes to enable services to run during the works.

York to Leeds/Wakefield Kirkgate via Castleford
Reinstatement of a second platform at Castleford which allows for diversionary trains to operate along both the York-Castleford-Leeds and York-Castleford-Wakefield Kirkgate routes along with some permanent services along the second route which join the main Transpennine route at Thornhill Junction.

Mirfield to Manchester Victoria via Brighouse and Todmorden
Upgrading of Brighouse Station and the Calder Valley line to allow for increased diversionary services from the Transpennine route between Mirfield and Manchester Victoria.

Geographical Context: Housing, Dwellings other tags: Parking Area Click a tag, to view other nearby images.
This photo is linked from: Automatic Clusters: · Thorpe Park Housing [8] ·
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
+
+
1:50,000 Modern Day Landranger(TM) Map © Crown Copyright
TIP: Click the map for more Large scale mapping
Grid Square
SE3734, 117 images   (more nearby 🔍)
Photographer
Stephen Craven   (more nearby)
Date Taken
Thursday, 12 March, 2026   (more nearby)
Submitted
Friday, 13 March, 2026
Subject Location
OSGB36: geotagged! SE 3777 3435 [10m precision]
WGS84: 53:48.2450N 1:25.6788W
Camera Location
OSGB36: geotagged! SE 3778 3432
View Direction
North-northwest (about 337 degrees)
Clickable map
+
NW N NE
W Go E
SW S SE
Image Type (about): geograph 
This page has been viewed about 20 times