2008
SD8218 : First blade is attached to Turbine Tower No 23
taken 18 years ago, 3 km from Waterfoot, Lancashire, England

First blade is attached to Turbine Tower No 23
On a dull June morning the first blade is attached to Turbine No 23 on Scout Moor.
At 450 metres above sea level the weather at this location can change dramatically.
Only one hour earlier the top of the tower was not visible due to mist and low cloud.
SD8218 : Turbine Blade Delivery to Tower No 23
SD8218 : Construction Crew of Turbine No 23 on Scout Moor
SD8218 : Turbine Tower No 23 under construction
SD8318 : Scout Moor Turbine Towers 15 and 21
SD7919 : Last Turbine Tower Delivery to Scout Moor
SD7919 : Turbine tower section passing Edenfield Primary School
Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80
Scout Moor Wind Farm Construction Picture Gallery
Link
At 450 metres above sea level the weather at this location can change dramatically.
Only one hour earlier the top of the tower was not visible due to mist and low cloud.
SD8218 : Turbine Blade Delivery to Tower No 23
SD8218 : Construction Crew of Turbine No 23 on Scout Moor
SD8218 : Turbine Tower No 23 under construction
SD8318 : Scout Moor Turbine Towers 15 and 21
SD7919 : Last Turbine Tower Delivery to Scout Moor
SD7919 : Turbine tower section passing Edenfield Primary School
Turbine details: Tower Height: 60m
Blade Length: 40m Total Max Height: 100m
Manufacturer: Nordex
Model: N80
Scout Moor Wind Farm Construction Picture Gallery
Link
